Completed project / Frinton-on-Sea, Essex

Oak-framed entrance porch

A bare entrance developed through measured drawings, material decisions and a completed oak structure.

See the four project stages

Project stages

How we plan and build your project.

This completed porch shows the four stages we use to plan, agree and build a project.

  1. Existing site: We visit the property, measure the existing space and discuss what the project needs.
  2. Project drawing: Plans and elevations show the size, layout and details that need to be agreed.
  3. Materials and finishes: The design view helps you review the proportions, materials and finishes before work starts.
  4. Completed project: We build the agreed design and complete the finishing work.
View project photographs

Project details

How the project was built.

A bare entrance transformed with brick bases, an oak frame and a carefully detailed pitched roof.

LocationFrinton-on-Sea, Essex

Work included

  • Brick plinths and entrance setting-out
  • Oak frame, posts and bracing
  • Pitched tiled roof and final detailing
Explore related services

Your project

Discuss a similar project.

Send your postcode, project stage and a short outline. We will include this project name with your enquiry.

Discuss an oak porch